South elevation, current state
South elevation, restoration ongoing (1)
South elevation, restoration ongoing (2)
North elevation, current state
North elevation, restoration ongoing (1)
North elevation, restoration ongoing (2)
East elevation, current state
East elevation, restoration ongoing
North-west elevation, restoration ongoing.
West elevation, restoration ongoing
East terrace, first floor, current state
North terrace, first floor, current state
East aisle, first floor, current state
East aisle, first floor, restoration ongoing
South corridoi, first floor, current state.
South corridoi, first floor, restoration ongoing (1).
South corridoi, first floor, restoration ongoing (1).
Side stages, first floor, current state & restoration ongoing.
Year 2019
Work started in 2018
Work finished in 2019
Status Completed works
Type Parks, Public Gardens / Multi-purpose Cultural Centres / Theatres / Wellness Facilities/Spas / Bars/Cafés / Interior Design / Recovery/Restoration of Historic Buildings / Restoration of façades / Building Recovery and Renewal
{{item.text_origin}}