Firm: Sweeny &Co. Architects
Type: Commercial › Office
STATUS: Built
YEAR: 2010
SIZE: 25,000 sqft - 100,000 sqft
BMW Group Headquarters and Training Centre in Canada, a 4-storey office building which houses a unique program that combining office space, BMW’s marketing school, and state-of-the-art training labs for future technicians and dealers. The result is a building that attracts top talent to BMW with high-performance features that reinforce their brand.
This project is LEED® Silver.
BMW Group Canada retained Sweeny&Co to design and develop their new turn-key headquarters north of Toronto on a 5.8-acre site facing Highway 404.As building architects and interior designers for BMW, Sweeny&Co designed comfortable, sustainable working spaces with expansive views, natural light, individual air and temperature control, operable windows and automated building features which promote the morale, productivity and commitment of BMW’s employees. An exposed circulation stair connects the four storeys on the interior, creating both physical and social connectivity. Using an open space concept, the work spaces are connected in pods to encourage collaboration and open communication. Offset cores resulting in large floor plates, and the raised floor system facilitates maximum future organizational flexibility. Other sustainable features include low flow plumbing fixtures and rainwater collection to reduce the use of potable water. The result is a building that supports the BMW staff and brings to their architecture high-performance features that reinforce their brand.
{{item.text_origin}}