登录
注册

登录狒狒灵感,立即享受以下权益:

  • 每日免费下载特权
  • 上亿高清灵感图任意下载/不限浏览
  • AI智能扩大图免费使用

葡萄牙波尔图瓦兹敏交通协调中心翻新

发布时间:2022-05-08 00:10:33 00
设计亮点
功能重组,提高 accessibility,创造新的停车场所,注重环保与便捷。

Architects:Pitágoras Group

Area :2970 m²

Year :2021

Photographs :Arménio Teixeira, Pitágoras Group

Collaborators : João Couto, Hélio Pinto Alves, Tiago Ranhada

Foundations And Structures : Projegui

Hydraulic Engineering : Projegui

Mechanical Engineering : CLE

Electrical Engineering : Feris, Projectos Eléctricos

City : Póvoa de Varzim

Country : Portugal

葡萄牙波尔图瓦兹敏交通协调中心翻新

葡萄牙波尔图瓦兹敏交通协调中心翻新

The rehabilitation project of Póvoa de Varzim Transport Coordination Centre supposes a two-level approach: programmatic and constructive.

葡萄牙波尔图瓦兹敏交通协调中心翻新

Refocusing on the current role of the transport coordinating center in the city and in its entire mobility strategy, where collective transport becomes increasingly more important. In this sense, a functional reorganization of the entire building was carried out, becoming it more appropriate for the current function, for both users and operators. Accesses and routes were reformulated, creating a new hierarchy, where accessibility for people with reduced mobility was fully ensured.

葡萄牙波尔图瓦兹敏交通协调中心翻新

New facilities have been introduced in the program, such as the city’s traffic and mobility control centre, which also aim to increase its dynamism and importance as a public building.

葡萄牙波尔图瓦兹敏交通协调中心翻新

葡萄牙波尔图瓦兹敏交通协调中心翻新

葡萄牙波尔图瓦兹敏交通协调中心翻新

葡萄牙波尔图瓦兹敏交通协调中心翻新

The central volume of the building is the one that houses all the valences directly related to the use of the Transport Coordination Centre users in a comfortable environment and has now a single entrance. In this area are the operator’s sales points, taxi rank, commercial spaces, cafeteria, waiting areas, and sanitary facilities.

葡萄牙波尔图瓦兹敏交通协调中心翻新

葡萄牙波尔图瓦兹敏交通协调中心翻新

The entire public space in front of the building was redesigned in order to open the building to the city, which didn’t happen before. It is intended that this area works not only as a space for passing by but also as a space of permanence, where there is no lack of places to park bicycles.

葡萄牙波尔图瓦兹敏交通协调中心翻新

The reorganization of the entire exterior area, which looks towards the passengers' waiting area, envisages the creation of a new car park in its own domain and with exclusive access, equipped with electric vehicle charging stations. The entire bus area has now just one circuit dedicated to entrances and exits with full access control.

葡萄牙波尔图瓦兹敏交通协调中心翻新

▼项目更多图片

葡萄牙波尔图瓦兹敏交通协调中心翻新

葡萄牙波尔图瓦兹敏交通协调中心翻新

葡萄牙波尔图瓦兹敏交通协调中心翻新

葡萄牙波尔图瓦兹敏交通协调中心翻新

葡萄牙波尔图瓦兹敏交通协调中心翻新

葡萄牙波尔图瓦兹敏交通协调中心翻新

葡萄牙波尔图瓦兹敏交通协调中心翻新

葡萄牙波尔图瓦兹敏交通协调中心翻新

葡萄牙波尔图瓦兹敏交通协调中心翻新

没有更多了