设计亮点
运用计算机设计和机器人生产技术,实现模块化仿生建筑,展现生物原理在建筑领域的应用。

In summer 2011 the Institute for Computational Design (ICD) and the Institute of Building Structures and Structural Design (ITKE), together with students at the University of Stuttgart have realized a temporary, bionic research pavilion made of wood at the intersection of teaching and research.

The project explores the architectural transfer of biological principles of the sea urchin’s plate skeleton morphology by means of novel computer-based design and simulation methods, along with computer-controlled manufacturing methods for its building implementation. A particular innovation consists in the possibility of effectively extending the recognized bionic principles and related performance to a range of different geometries through computational processes, which is demonstrated by the fact that the complex morphology of the pavilion could be built exclusively with extremely thin sheets of plywood (6.5 mm).

BIOLOGICAL SYSTEM

The project aims at integrating the performative capacity of biological structures into architectural design and at testing the resulting spatial and structural material-systems in full scale. The focus was set on the development of a modular system which allows a high degree of adaptability and performance due to the geometric differentiation of its plate components and robotically fabricated finger joints.

During the analysis of different biological structures, the plate skeleton morphology of the sand dollar, a sub-species of the sea urchin (Echinoidea), became of particular interest and subsequently provided the basic principles of the bionic structure that was realized. The skeletal shell of the sand dollar is a modular system of polygonal plates, which are linked together at the edges by finger-like calcite protrusions. High load bearing capacity is achieved by the particular geometric arrangement of the plates and their joining system. Therefore, the sand dollar serves as a most fitting model for shells made of prefabricated elements. Similarly, the traditional finger-joints typically used in carpentry as connection elements, can be seen as the technical equivalent of the sand dollar’s calcite protrusions.

MORPHOLOGY TRANSFER

Following the analysis of the sand dollar, the morphology of its plate structure was integrated in the design of a pavilion. Three plate edges always meet together at just one point, a principle which enables the transmission of normal and shear forces but no bending moments between the joints, thus resulting in a bending bearing but yet deformable structure. Unlike traditional lightweight construction, which can only be applied to load optimized shapes, this new design principle can be applied to a wide range of custom geometry. The high lightweight potential of this approach is evident as the pavilion that could be built out of 6.5 mm thin sheets of plywood only, despite its considerable size. Therefore it even needed anchoring to the ground to resist wind suction loads. Besides these constructional and organizational principles, other fundamental properties of biological structures are applied in the computational design process of the project:

– Heterogeneity: The cell sizes are not constant, but adapt to local curvature and discontinuities. In the areas of small curvature the central cells are more than two meters tall, while at the edge they only reach half a meter.

– Anisotropy: The pavilion is a directional structure. The cells stretch and orient themselves according to mechanical stresses.

– Hierarchy: The pavilion is organized as a two-level hierarchical structure. On the first level, the finger joints of the plywood sheets are glued together to form a cell. On the second hierarchical level, a simple screw connection joins the cells together, allowing the assembling and disassembling of the pavilion. Within each hierarchical level only three plates – respectively three edges – meet exclusively at one point, therefore assuring bendable edges for both levels.

COMPUTATIONAL DESIGN AND ROBOTIC PRODUCTION

A requirement for the design, development and realization of the complex morphology of the pavilion is a closed, digital information loop between the project’s model, finite element simulations and computer numeric machine control. Form finding and structural design are closely interlinked. An optimized data exchange scheme made it possible to repeatedly read the complex geometry into a finite element program to analyze and modify the critical points of the model. In parallel, the glued and bolted joints were tested experimentally and the results included in the structural calculations.

The plates and finger joints of each cell were produced with the university’s robotic fabrication system. Employing custom programmed routines the computational model provided the basis for the automatic generation of the machine code (NC-Code) for the control of an industrial seven-axis robot. This enabled the economical production of more than 850 geometrically different components, as well as more than 100,000 finger joints freely arranged in space. Following the robotic production, the plywood panels were joined together to form the cells. The assembly of the prefabricated modules was carried out at the city campus of the University of Stuttgart. All design, research, fabrication and construction work were carried out jointly by students and faculty researchers.

The research pavilion offered the opportunity to investigate methods of modular bionic construction using freeform surfaces representing different geometric characteristics while developing two distinct spatial entities: one large interior space with a porous inner layer and a big opening, facing the public square between the University’s buildings, and a smaller interstitial space enveloped between the two layers that exhibits the constructive logic of the double layer shell.

这是2011年夏季ICD,ITKE以及斯图加特大学学生共同完成的一个研究教学临时木材展馆。通过计算机设计探讨海胆的骨架,并让其转化为实际的建造,这是一个创新,拓展了仿生学与建筑的结合度。展馆的复杂形态由不同几何形状的极薄(6.5毫米)胶合板组成。

生态系统

在建筑设计中融入对生物结构及其空间以及结构材料的全面研究测试。用模块化的系统达到高度适应性和性能。联接的方式是重要节点。分析海胆,并研究出仿生结构的基本框架。多变和和方解石般的表面突起有利于承载力。传统的木工链接节点非常优美。

形态转换

计算机设计和机器人

生产计算机设计后有及其生产单元板和链接处的节点。人们使用代码控制机器,经济的生产了850多个不同的几何组件,以及上面超过10万的链接节点。亭子组装在斯图加特大学校园。从设计,研发,制造和施工——-学生,教员,研究人员全程参与。这个项目研究了模块化仿生建筑的方法,用任意多边形形成两种截然不同的空间实体,一个有孔的亭子和内部多孔的空间。这个两层高小亭子带着双层表皮安立在大学校园之中。

PROJECT TEAM:

Institute for Computational Design – Prof. AA Dipl.(Hons) Achim Menges Achim Menges

Institute of Building Structures and Structural Design – Prof. Dr.-Ing. Jan Knippers

Competence Network Biomimetics Baden-Württemberg

CONCEPT & PROJECT DEVELOPMENT:

Oliver David Krieg, Boyan Mihaylov

PLANNING & REALISATION:

Peter Brachat, Benjamin Busch, Solmaz Fahimian, Christin Gegenheimer, Nicola Haberbosch,

Elias Kästle, Oliver David Krieg, Yong Sung Kwon, Boyan Mihaylov, Hongmei Zhai

SCIENTIFIC DEVELOPMENT:

Markus Gabler (project management), Riccardo La Magna (structural design), Steffen Reichert

(detailing), Tobias Schwinn (project management), Frédéric Waimer (structural design)

PROJECT SPONSORS:

Main sponsors: KUKA Roboter GmbH, Ochs GmbH

Sponsors: KST2 Systemtechnik GmbH, Landesbetrieb Forst Baden-Württemberg (ForstBW),

Stiftungen LBBW, Leitz GmbH & Co. KG, MüllerBlaustein Holzbau GmbH, Hermann Rothfuss

Bauunternehmung GmbH & Co., Ullrich & Schön GmbH, Holzhandlung Wider GmbH & Co. KG

PROJECT DATA:

Address Keplerstr. 11-17, 70174 Stuttgart

Date of completion August 2011

Surface 72m²

Volume 200m³

Material 275 m² Birch plywood 6,5mm Sheet thickness

MORE:

Prof. Achim Menges

,更多请至:

{{item.text_origin}}

仿生结构之美 | 斯图加特大学 ICD/ITKE 2011 设计展示馆
没有更多了
相关推荐
{{searchCollectStatus("Qle47AM89amNKBRvJ0BxLvZE5RkPgjW1",1).value ? '已收藏': '收藏'}}
Kingsley College Treehouse Block | 现代与传统的和谐交融
预览
DE设计事务所
{{searchData("Qle47AM89amNKBRvJ0BxLvZE5RkPgjW1").value.views.toLocaleString()}}
{{searchData("Qle47AM89amNKBRvJ0BxLvZE5RkPgjW1").value.collects.toLocaleString()}}
{{searchCollectStatus("6pOPj1a4kvMnyV7m1WBbl30Lx7WKA5mY",1).value ? '已收藏': '收藏'}}
捷克 Komořany 小学 | 融入自然的生态校园
预览
David Elalouf
{{searchData("6pOPj1a4kvMnyV7m1WBbl30Lx7WKA5mY").value.views.toLocaleString()}}
{{searchData("6pOPj1a4kvMnyV7m1WBbl30Lx7WKA5mY").value.collects.toLocaleString()}}
{{searchCollectStatus("Jr5qb3xMvNPG0V2mqbwdOpjQoRElZn14",1).value ? '已收藏': '收藏'}}
Hankasalmi School Centre | 绿色校园,树之灵魂
预览
Tamborí Arquitectes
{{searchData("Jr5qb3xMvNPG0V2mqbwdOpjQoRElZn14").value.views.toLocaleString()}}
{{searchData("Jr5qb3xMvNPG0V2mqbwdOpjQoRElZn14").value.collects.toLocaleString()}}
{{searchCollectStatus("R6KmANPp5WZMowlzaoXx3g1O79kya4Dz",1).value ? '已收藏': '收藏'}}
四川外国语大学成都学院宜宾校区 | 环形创新设计,融合自然与学术
预览
Sergio Crauso
{{searchData("R6KmANPp5WZMowlzaoXx3g1O79kya4Dz").value.views.toLocaleString()}}
{{searchData("R6KmANPp5WZMowlzaoXx3g1O79kya4Dz").value.collects.toLocaleString()}}
{{searchCollectStatus("6rDdmZk8nxM4YBJlv7VW152ba9EPzqLN",1).value ? '已收藏': '收藏'}}
STREAM Classrooms | 百年老校的现代教育空间革新
预览
Amir Kharaghani
{{searchData("6rDdmZk8nxM4YBJlv7VW152ba9EPzqLN").value.views.toLocaleString()}}
{{searchData("6rDdmZk8nxM4YBJlv7VW152ba9EPzqLN").value.collects.toLocaleString()}}
{{searchCollectStatus("9yjWYna2xeGoQBMEdpBzvER4K71lqm6A",1).value ? '已收藏': '收藏'}}
巴西 80 年代学校翻新,色彩统一视觉沟通
预览
Parsonson Architects
{{searchData("9yjWYna2xeGoQBMEdpBzvER4K71lqm6A").value.views.toLocaleString()}}
{{searchData("9yjWYna2xeGoQBMEdpBzvER4K71lqm6A").value.collects.toLocaleString()}}
{{searchCollectStatus("jP4YxLk7NeaOEBNeZEXRmgZb9z61WGJn",1).value ? '已收藏': '收藏'}}
纳什维尔基督教预备学院艺术中心 | 创意舞台,绿色校园
预览
THELí
{{searchData("jP4YxLk7NeaOEBNeZEXRmgZb9z61WGJn").value.views.toLocaleString()}}
{{searchData("jP4YxLk7NeaOEBNeZEXRmgZb9z61WGJn").value.collects.toLocaleString()}}
{{searchCollectStatus("6yd5eDAz2aPRqBAoOQVvkEYWxlNQrZ17",1).value ? '已收藏': '收藏'}}
UNR 艺术中心 | 现代主义风格的多功能艺术楼
预览
张皓楠
{{searchData("6yd5eDAz2aPRqBAoOQVvkEYWxlNQrZ17").value.views.toLocaleString()}}
{{searchData("6yd5eDAz2aPRqBAoOQVvkEYWxlNQrZ17").value.collects.toLocaleString()}}
{{searchCollectStatus("YqR2jMxvKog7DXzZ7nXZLN53Oepbymd8",1).value ? '已收藏': '收藏'}}
梦幻星空下的交通安全教育馆
预览
ALTA
{{searchData("YqR2jMxvKog7DXzZ7nXZLN53Oepbymd8").value.views.toLocaleString()}}
{{searchData("YqR2jMxvKog7DXzZ7nXZLN53Oepbymd8").value.collects.toLocaleString()}}
{{searchCollectStatus("GOna7ER5P863zXK0l9BJpj9LrWNxkogv",1).value ? '已收藏': '收藏'}}
长沙育英乐托育中心 | 探险、勇敢、快乐、成长的儿童成长空间
预览
WINGS sas Lino Busetti
{{searchData("GOna7ER5P863zXK0l9BJpj9LrWNxkogv").value.views.toLocaleString()}}
{{searchData("GOna7ER5P863zXK0l9BJpj9LrWNxkogv").value.collects.toLocaleString()}}
{{searchCollectStatus("M8v30GPgRbDK5VYlmGwYolxzjk9NnrZQ",1).value ? '已收藏': '收藏'}}
国际幼儿园成长中心 | 探索孩子内心世界的乐章
预览
Stefano Tardito
{{searchData("M8v30GPgRbDK5VYlmGwYolxzjk9NnrZQ").value.views.toLocaleString()}}
{{searchData("M8v30GPgRbDK5VYlmGwYolxzjk9NnrZQ").value.collects.toLocaleString()}}
{{searchCollectStatus("Pam869vylbKxAVppjQVZe0dpq75GnDgQ",1).value ? '已收藏': '收藏'}}
“环境第三教师”理念下的幼儿园空间改造
预览
颜玲
{{searchData("Pam869vylbKxAVppjQVZe0dpq75GnDgQ").value.views.toLocaleString()}}
{{searchData("Pam869vylbKxAVppjQVZe0dpq75GnDgQ").value.collects.toLocaleString()}}