After analysis of the site (slope and orientation) the proposal was to divide the site into two levels: one at street level and another three meters above. This allows an overlap which in turn allows for a higher density and helps to integrate more with neighboring buildings. It takes advantage of the slope of the land and enables each building to operate independently. There is a shared space between the two buildings to allow access and to maneuver vehicles.
{{item.text_origin}}