项目信息:原建筑为3层快捷宾馆户型,房间数量60间,二次改造项目足道加宾馆,全部翻新,原基础和结构不变,隐蔽工程修复更换,本项目的特点就是工期短(45天工期),造价控制合理。 Project information: the original building is a 3-storey Express Hotel, with 60 rooms. The secondary reconstruction project is the foot road plus hotel, which is completely renovated. The original foundation and structure are unchanged, and the concealed works are repaired and replaced. The project is characterized by short construction period (45 days) and reasonable cost control.
{{item.text_origin}}