Architects:Dreyfuss + Blackford Architecture
Area:131495ft²
Year:2019
Photographs:Bruce Damonte
Manufacturers:AutoDesk,Armstrong Acoustic Ceiling Tile,Caesarstone,Daltile,Forbo Industries,Formica,Haworth Wall Systems,Kolorines Daltile,PPG Paints,Shaw Contract Group Carpet Tile,Sherwin Williams,Topakustik Acoustic Wall Panel,Wausau Tile Terrazzo
Mechanical Engineer:Capital Engineering Consultants Inc
Structural Engineer:Buehler Engineering Inc.
Landscape Architect:Callander Associates Landscape Architecture Inc.
Construction Manager:Kitchell CEM
Civil Engineer:Morton & Pitalo
Contractor:Roebbelen Contracting Inc.
Electrical Engineer:The Engineering Enterprise
Design Team:Kristopher Barkley, Rod Dow, Jennifer Reid, Raquel Urbani, Alan Dreyfuss
Clients:Sacramento Municipal Utility District
Historic Preservation Architect:Wiss,Janney,Elstner Associates
Mechanical/Plumbing Engineer:Capital Engineering Consultants, Inc
Plumbing Engineer:Capital Engineering Consultants Inc
City:Sacramento
Country:United States
Text description provided by the architects. After 60 years of continuous use, an extensive rehabilitation of the Sacramento Municipal Utility District (SMUD) Headquarters is finally complete. Renovation of this landmark mid-century modern design has brought this iconic 146,000 SF building into the 21st Century while artfully addressing the concerns of the preservation community.
In 1958 Dreyfuss + Blackford designed this building for a young utility and were commissioned in 2014 to renovate the entire facility inside and out. A carefully considered addition allows for greatly increased daylighting and access to views. A central enclosed stair and mechanical shaft was replaced with a large open stair for enhanced vertical circulation and transparency between wings.
Open offices were completely updated to include different types of conferencing, meeting and break areas with modern furniture and finishes. Open office areas were completely modernized to address the needs of SMUD’s multi-generational workforce while incorporating the original concept of an over-arching five-foot grid.
Also included in this renovation were site and landscape improvements designed to historically maintain significant features of the 13-acre site and artist Wayne Thiebaud’s mosaic tile mural “Water City,” was carefully cleaned and preserved with the assistance of historic preservation architects at Wiss, Janney, Elstner and Associates, Inc (WJE). The SMUD Headquarters is on the National Register of Historic Places and the rehabilitation was designed to achieve LEED Gold certification.