The leaders of «Siemens» decided to combine several disparate offices and acquired a modern 6-storey building with a two-level underground parking on the Bolshaya Tatarskay st., in the center of Moscow.
The leaders of «Siemens» decided to combine several disparate offices and acquired a modern 6-storey building with a two-level underground parking on the Bolshaya Tatarskay st., in the center of Moscow.
In the work area there are a number of interesting solutions: mobile file archives, that are easily wheeled to the desired table, individual cells, where, if necessary, baggage can be hidden and brightly colored sofas with high sound-absorbing back. To complete the picture, it must be mentioned that there also are coffee points, areas for blitz-meetings and plenty of hot desks. Furthermore, almost all work desks are equipped with a lifting mechanism, which enables you to work both sitting and standing.
The lighting solution requires special attention. Architects almost completely abandoned the standard build-in ceiling lights, instead installing floor-standing luminaries with occupancy sensors. Only in a few corridor areas LED down-lights are used. All this led to significant energy saving, enabling Siemens to claim the prestigious international certification LEED (Leadership in Energy and Environmental Design).
Year 2011
Work started in 2011
Work finished in 2011
Status Completed works
Type Corporate Headquarters / Offices/studios / Interior Design
{{item.text_origin}}