The Assembly Hall is a former industrial hall, located on an old industrial site in Valby, which has now been transformed into the lively district of Valby Maskinfabrik. C.F. Møller handled the transformation of Montagehallen (the Assembly Hall), where the original industrial expression has been preserved, while filling the interior with modern commercial premises and homes, and also an event and community building.
大会堂是一个旧的工业大厅,坐落在旧的工业场地上,现在已经变成了一个热闹的区。莫勒负责改造(大会堂),保留原有的工业表达方式,同时在室内充满现代商业房舍和住宅,同时也是一项活动和社区建设。
The Assembly Hall is a listed building, and in connection with the conversion, C.F. Møller also contributed an analysis of the conservation value of the hall. This value relates, among other things, to the hall's 200-metre long building volume, the façade’s red-lead steel grating structure, infilled with panels of red brick, and the characteristic gable motif, denoted by the hall's curved roof and prism-shaped skylights.
大会堂是一栋列入清单的建筑,在改建方面,默勒还对大厅的养护价值进行了分析。这个值,除其他外,与大厅的200米长的建筑体积有关,门面的红铅钢光栅结构,带有红砖的面板,以及由大厅的弧形屋顶和形状所构成的特点。
In order to preserve the hall’s unique patina, the new commercial premises and the event and community building, located at opposite ends of the building, are insulated from the inside by a climate screen of glass. Behind the glass, you can still see traces of the hall's previous use. At each end of the hall a new interior volume has been inserted, supported by an industrial steel structure in line with the building's original expression.
为了保护大厅的独特之处,位于建筑物两端的新的商业场所和活动及社区建筑被玻璃的气候屏与内部隔开。在玻璃后面,你仍然可以看到大厅以前使用的痕迹。大厅的每一端都插入了一个新的内部空间,由工业钢结构支撑,与建筑物的原始表达方式相一致。
In the middle section of the hall, where the residential units are located, a new set-back façade has been built, ensuring good daylight conditions all the way through the apartments. With the help of a steel structure mounted on the new façade, the cadence and the long, rhythmic flow of the original façade are continued. The steel structure is also used to mount the balconies. Each residential unit has a balcony or ground-floor terrace, and a living room with a large west-facing glass section that spans the width of the entire room.
在大厅的中间部分,也就是住宅单元所在的地方,已经建造了一个新的背靠背立面,确保了整个公寓的良好的日光条件。在安装在新立面上的钢结构的帮助下,原有立面的延伸和长流得以延续。钢结构也用于安装。每个住宅单元都有一个阳台或底层,以及一个带有大的西面玻璃部分的客厅,其宽度相当于整个房间的宽度。
Client: Phase 1: De Forenede Ejendomsselskaber (DFE), Phase 2: Jørgen Friis Poulsen
客户:第一阶段:第二阶段:
Size: 10,100 m², 1,400 m² office, 1,200 m² event and community centre as well as 66 living units
面积:平方米,办公室面积为平方米,活动场地和社区中心面积为1 200平方米,生活单元为66个
Address: Valby
地址:
Year: 2014-2018
Year: 2014-2018
Architect: C.F. Møller Architects
建筑师:莫勒
Landscape: C.F. Møller Landscape and Schønherr
景观:莫勒景观与莫勒景观
Firm C.F. Møller Architects
Type Commercial › Office Cultural › Hall/Theater Residential › Multi Unit Housing
STATUS Built
YEAR 2018
SIZE 100,000 sqft - 300,000 sqft
keywords:architecture, architecture news, interiors, interior design, portfolio, spec, brands, marketplace, products Valby Machinery Halls - Assembly Hall
关键词:建筑,建筑新闻,设计,室内设计,组合,品牌,市场,产品加工机械-大会堂
{{item.text_origin}}