架构师提供的文本描述。位于该镇主干道上的孤树社区健康中心将成为这个有1400人的小镇的聚集地,与其命名的榆树没有什么不同。作为一种宝贵的社区资源,它加深了居民的根基,促进了城镇的发展。
Text description provided by the architects. The Lone Tree Community Wellness Center, located on the town’s main thoroughfare, will serve as a gathering place for this town of 1,400 people, not unlike the elm tree for which it is named. As a valuable community resource, the building deepens residents’ roots and encourages the town’s growth.
Text description provided by the architects. The Lone Tree Community Wellness Center, located on the town’s main thoroughfare, will serve as a gathering place for this town of 1,400 people, not unlike the elm tree for which it is named. As a valuable community resource, the building deepens residents’ roots and encourages the town’s growth.
© Integrated Studio
综合演播室
该项目起源于孤树社区学区对摔跤室和大型健身房的需求。摔跤队是在一座隔热不良的金属建筑上运作的,而篮球队则挤进了隔壁一个面积不足的地方。建筑师过去曾两次为该地区设计学校增建项目,因此这一项目延续了一段牢固的关系。
The project originated with the Lone Tree Community School District’s need for a wrestling room and full-sized gym. The wrestling team operated from a poorly-insulated metal building while the basketball team squeezed into an undersized space next door. The Architect had designed school additions for the District twice in the past, so this project continued a well-established relationship.
The project originated with the Lone Tree Community School District’s need for a wrestling room and full-sized gym. The wrestling team operated from a poorly-insulated metal building while the basketball team squeezed into an undersized space next door. The Architect had designed school additions for the District twice in the past, so this project continued a well-established relationship.
© Integrated Studio
综合演播室
这一进程获得了势头,并有机会实现社区的健康和健康目标。通过合作,社区学区和城市为该设施筹集了必要的资金,学校将拥有这些资金并共同使用。包括场地工程和景观美化在内,建筑费用为127美元/SF。
The process gained momentum with the opportunity to address the community’s health and wellness goals as well. By partnering, the Community School District and the City raised the necessary funds for the facility, which the school will own and operate for shared use. Including sitework and landscaping, building costs amounted to $127/sf.
The process gained momentum with the opportunity to address the community’s health and wellness goals as well. By partnering, the Community School District and the City raised the necessary funds for the facility, which the school will own and operate for shared use. Including sitework and landscaping, building costs amounted to $127/sf.
Ground Floor Plan
Section Perspective A
A节
在新的建筑里,一条高耸的室内跑道围绕着摔跤/运动室的立足点,俯瞰着篮球场。这座建筑的语言清晰而直接。透明半透明的材料在街道前部,白天引入城镇,项目用户在夜间移动。物质性是最小的和持久的,与黑色油漆钢结构互联,白昼空间。
In the new building, a raised indoor track orbits the wrestling/exercise room’s perch overlooking the basketball court. The building’s language is clear and direct. Transparent and translucent materials at the street front usher in the town during the day and project users’ movement at night. Materiality is minimal and durable, with black-painted steel structuring interconnected, daylit spaces.
In the new building, a raised indoor track orbits the wrestling/exercise room’s perch overlooking the basketball court. The building’s language is clear and direct. Transparent and translucent materials at the street front usher in the town during the day and project users’ movement at night. Materiality is minimal and durable, with black-painted steel structuring interconnected, daylit spaces.
© Integrated Studio
综合演播室
{{item.text_origin}}