Facts and Figures
Client: Location: University of Antwerp
Architects: Drie Eiken Campus, Antwerp
Meta Project Leader: Frederik Bogaerts
Meta Project Staff: Stijn Elsen, Simone Valerio, Rob Wesselink
Stability, Technology, Epb Reporting And Acoustics: Tractebel
Project Managing Board: Marc De Smet
Project Manager: Veerle Van Geldre
Project Staff: Jeroen De Wael, Kevin Morlion, Ive De Maeseneire, Magda Morel, Hinde El Kassmi, Marjolein Vandersickel
Art Integration: Perry Roberts
Collaborators: Storimans Wijffels Architects
Landscape Design: Urban Design & Landscape Architecture West 8
Safety Coordinator: François Jordaens (University Of Antwerp)
Main Contractor: Thv Atro Cfe (Temporary Trading Partnership)
Image: Filip Dujardin © Meta Architectuurbureau
Building O Surface Area: 8,520 m
2
Accommodates 1,850 Students
2,856 Unique Façade Panels
700 Holes Punched Per m
2
Foundation: More Than 400 Posts
400 Tonnes Of Reinforcing Steel
3,300 M3 Of Concrete, Poured On Site
Geo-Thermal Energy (Renewable Energy): 24 Vertical Boreholes Each With A Depth Of 145 m
1,400 Lighting Xtures
2,500 Plugs
27 Km Data Cabling