The old structure with its characteristic columns is now an asset, and by designing a special climate system, ample height is ensured in the office areas. Details like the exposed raw concrete against the smooth glass surface of the new elements and facade, emphasize the fluid merge between old and new. The materialization scheme was kept simple, the cool concrete of the existing building is contrasted with warm hues of wood and fabrics, never compromising on transparency.
▼室内细部,interior detailed view
©Lucas van der Wee
▼走廊灯光效果,corridor with lights on
©Lucas van der Wee
在经过大范围的招标后,荷兰中央政府机构最终委任R Creators集团来控制项目的设计、建造和运营,并与之签订了20年的开发阶段合约,使后者可以领取资金以实施建筑的维护和运营。
尽管设计任务书中包含了涉及功能、安全、声学、气候、可持续性和美观性的多达21014项要求,设计团队依然出色地完成了任务,尽其所能地创造出最舒适友好的办公环境。
立足于“人与建筑的中心”这一观念,该项目被评选为荷兰最受欢迎的政府办公建筑,室内设计部分还获得了享有声誉的FRAME大奖。
▼广场视角,view from the square
©Lucas van der Wee
The Dutch Central Government Agency commissioned the design, construction, and operations to the consortium R Creators after an extensive bidding process. They are contracted to finance the transformation with an exploitation phase of 20 years, making them responsible for maintenance and operation. This made for a complex field of stakeholders, various users, and strict government requirements.
Although the Programme of Demands consisted of 21014 requirements – relating to functionality, safety, acoustics, climate, sustainability, and aesthetics – the team managed to realize the extremely high ambitions while creating the most comfortable and welcoming working environment. According to ‘Centre for People and Buildings’ it is one of the most appreciated Dutch Government Office Buildings to work in and the interior was awarded a prestigious FRAME Award.
▼中庭夜景,atrium night view
©Lucas van der Wee
▼平面图,floor plans
▼剖面图,section
project: Rijkskantoor ‘de Knoop’ (Government Office Building)contracting authority: Central Government Real Estate Agency (Rijksvastgoedbedrijf)
client: R Creators:A consortium of Strukton Worksphere, Ballast Nedam, Facilicom
Site of the building: Mineurslaan 500, 3521 AG Utrecht
Total area: 32.944 m² gfa
Start Design: January 2014
Completion: February 2018
Photography: Cepezed | Lucas van der Wee
Building Architecture CEPEZED, Netherlands,Interior Architecture FOKKEMA & PARTNERS ARCHITECTEN.
Urban Architecture RIJNBOUTT, Netherlands
Design Team: Laura Atsma, Marjan van Diepen, Pieterjan Corten, Rick Rijkse, Patrick
Levie, Anne Marie Boon (Fokkema & Partners) Ronald Schleurholts, Jan Pesman, Paddy Sieuwerts, Jaap
Bosch, Ruben Molendijk, Lisen Hablé, Steven Goeman, Peter van den Heuvel, Ronald van Houten, Rutger
Kuipers, Robertus de Bruin, Jorg Voogt, Paul Oehlers, Frank Smit (Cepezed)Contractor Strukton Worksphere
Contractor Ballast Nedam
Operations and Maintenance Facilicom
Structural engineer Pieters Bouwtechniek, Delft
Installation engineer Strukton Worksphere, Maarssen
Building physics engineer DGMR, Den Haag
Building consultancy Deerns, Rijswijk
Installation technique Strukton Worksphere, Maarssen
Steel construction Staalbouw Nagelhout Bakhuizen, Bakhuizen
Facade De Groot & Visser, Gorinchem
Floor covering Maasdam, Waddinxveen (supplier)– Interface (project carpet)– Marazzi (ceramic stone)Walls Verwol, Delft (interior walls, partition systems, acoustic panels)Jalousie systems/sunscreens Hunter Douglas
Ceiling systems Inteco
Lighting Trilux, Amersfoort
Furniture Maasdam, Waddinxveen (dealer)Gielissen, Eindhoven (fixed furniture)Textiles De Ploeg, Helmond (curtains)Presentation systems BIS, Ridderkerk (Audio-Visual & ICT integration)